Lead Paint Risk in Hatillo zona urbana, PR
49.2%Pre-1978 Housing
1,017Pre-1978 Units
2,067Total Housing Units
ElevatedRisk Level
How Hatillo zona urbana Compares
What This Means for Hatillo zona urbana Residents
Hatillo zona urbana has an elevated level of pre-1978 housing (49.2%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Hatillo zona urbana
Get a more detailed risk assessment for a specific address.