Lead Paint Risk in Aibonito zona urbana, PR
56.5%Pre-1978 Housing
2,179Pre-1978 Units
3,854Total Housing Units
ElevatedRisk Level
How Aibonito zona urbana Compares
What This Means for Aibonito zona urbana Residents
Aibonito zona urbana has an elevated level of pre-1978 housing (56.5%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Aibonito zona urbana
Get a more detailed risk assessment for a specific address.