Lead Paint Risk in Phoenixville, PA
56.8%Pre-1978 Housing
5,318Pre-1978 Units
9,360Total Housing Units
ElevatedRisk Level
How Phoenixville Compares
What This Means for Phoenixville Residents
Phoenixville has an elevated level of pre-1978 housing (56.8%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Phoenixville
Get a more detailed risk assessment for a specific address.