Lead Paint Risk in Emerald Lakes, PA
11.0%Pre-1978 Housing
179Pre-1978 Units
1,625Total Housing Units
LowRisk Level
How Emerald Lakes Compares
What This Means for Emerald Lakes Residents
Most housing in Emerald Lakes was built after 1978 (89.0% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Emerald Lakes
Get a more detailed risk assessment for a specific address.