Lead Paint Risk in Carlisle Barracks, PA

16.6%Pre-1978 Housing
56Pre-1978 Units
337Total Housing Units
LowRisk Level

How Carlisle Barracks Compares

Carlisle Barracks
16.6%!<(MISSING)/span>
Pennsylvania
67.8%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Carlisle Barracks Residents

Most housing in Carlisle Barracks was built after 1978 (83.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Carlisle Barracks

Get a more detailed risk assessment for a specific address.