Lead Paint Risk in Prineville, OR
44.5%Pre-1978 Housing
2,131Pre-1978 Units
4,793Total Housing Units
ElevatedRisk Level
How Prineville Compares
What This Means for Prineville Residents
Prineville has an elevated level of pre-1978 housing (44.5%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Prineville
Get a more detailed risk assessment for a specific address.