Lead Paint Risk in Gaston, OR
58.5%Pre-1978 Housing
162Pre-1978 Units
277Total Housing Units
ElevatedRisk Level
How Gaston Compares
What This Means for Gaston Residents
Gaston has an elevated level of pre-1978 housing (58.5%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Gaston
Get a more detailed risk assessment for a specific address.