Lead Paint Risk in Cheshire, OR
7.5%Pre-1978 Housing
12Pre-1978 Units
160Total Housing Units
LowRisk Level
How Cheshire Compares
What This Means for Cheshire Residents
Most housing in Cheshire was built after 1978 (92.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Cheshire
Get a more detailed risk assessment for a specific address.