Lead Paint Risk in Cascade Locks, OR
52.3%Pre-1978 Housing
396Pre-1978 Units
757Total Housing Units
ElevatedRisk Level
How Cascade Locks Compares
What This Means for Cascade Locks Residents
Cascade Locks has an elevated level of pre-1978 housing (52.3%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Cascade Locks
Get a more detailed risk assessment for a specific address.