Lead Paint Risk in Silo, OK
48.7%Pre-1978 Housing
115Pre-1978 Units
236Total Housing Units
ElevatedRisk Level
How Silo Compares
What This Means for Silo Residents
Silo has an elevated level of pre-1978 housing (48.7%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Silo
Get a more detailed risk assessment for a specific address.