Lead Paint Risk in Sallisaw, OK
55.2%Pre-1978 Housing
2,028Pre-1978 Units
3,675Total Housing Units
ElevatedRisk Level
How Sallisaw Compares
What This Means for Sallisaw Residents
Sallisaw has an elevated level of pre-1978 housing (55.2%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Sallisaw
Get a more detailed risk assessment for a specific address.