Lead Paint Risk in Proctor, OK
19.3%Pre-1978 Housing
21Pre-1978 Units
109Total Housing Units
LowRisk Level
How Proctor Compares
What This Means for Proctor Residents
Most housing in Proctor was built after 1978 (80.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Proctor
Get a more detailed risk assessment for a specific address.