Lead Paint Risk in Porters Neck, NC
13.3%Pre-1978 Housing
455Pre-1978 Units
3,415Total Housing Units
LowRisk Level
How Porters Neck Compares
What This Means for Porters Neck Residents
Most housing in Porters Neck was built after 1978 (86.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Porters Neck
Get a more detailed risk assessment for a specific address.