Lead Paint Risk in Marvin, NC
1.6%Pre-1978 Housing
30Pre-1978 Units
1,871Total Housing Units
LowRisk Level
How Marvin Compares
What This Means for Marvin Residents
Most housing in Marvin was built after 1978 (98.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Marvin
Get a more detailed risk assessment for a specific address.