Lead Paint Risk in Marvin, NC

1.6%Pre-1978 Housing
30Pre-1978 Units
1,871Total Housing Units
LowRisk Level

How Marvin Compares

Marvin
1.6%!<(MISSING)/span>
North Carolina
34.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Marvin Residents

Most housing in Marvin was built after 1978 (98.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Marvin

Get a more detailed risk assessment for a specific address.