Lead Paint Risk in Kiryas Joel, NY
7.1%Pre-1978 Housing
521Pre-1978 Units
7,383Total Housing Units
LowRisk Level
How Kiryas Joel Compares
What This Means for Kiryas Joel Residents
Most housing in Kiryas Joel was built after 1978 (92.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Kiryas Joel
Get a more detailed risk assessment for a specific address.