Lead Paint Risk in Crouch Mesa, NM

13.7%Pre-1978 Housing
194Pre-1978 Units
1,418Total Housing Units
LowRisk Level

How Crouch Mesa Compares

Crouch Mesa
13.7%!<(MISSING)/span>
New Mexico
43.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Crouch Mesa Residents

Most housing in Crouch Mesa was built after 1978 (86.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Crouch Mesa

Get a more detailed risk assessment for a specific address.