Lead Paint Risk in Cañada de los Alamos, NM

17.4%Pre-1978 Housing
60Pre-1978 Units
344Total Housing Units
LowRisk Level

How Cañada de los Alamos Compares

Cañada de los Alamos
17.4%!<(MISSING)/span>
New Mexico
43.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Cañada de los Alamos Residents

Most housing in Cañada de los Alamos was built after 1978 (82.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Cañada de los Alamos

Get a more detailed risk assessment for a specific address.