Lead Paint Risk in Pahrump, NV
8.9%Pre-1978 Housing
1,871Pre-1978 Units
21,064Total Housing Units
LowRisk Level
How Pahrump Compares
What This Means for Pahrump Residents
Most housing in Pahrump was built after 1978 (91.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Pahrump
Get a more detailed risk assessment for a specific address.