Lead Paint Risk in Osino, NV
12.7%Pre-1978 Housing
48Pre-1978 Units
377Total Housing Units
LowRisk Level
How Osino Compares
What This Means for Osino Residents
Most housing in Osino was built after 1978 (87.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Osino
Get a more detailed risk assessment for a specific address.