Lead Paint Risk in Nellis AFB, NV

7.3%Pre-1978 Housing
87Pre-1978 Units
1,194Total Housing Units
LowRisk Level

How Nellis AFB Compares

Nellis AFB
7.3%!<(MISSING)/span>
Nevada
22.5%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Nellis AFB Residents

Most housing in Nellis AFB was built after 1978 (92.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Nellis AFB

Get a more detailed risk assessment for a specific address.