Lead Paint Risk in Fallon, NV
42.9%Pre-1978 Housing
1,977Pre-1978 Units
4,609Total Housing Units
ElevatedRisk Level
How Fallon Compares
What This Means for Fallon Residents
Fallon has an elevated level of pre-1978 housing (42.9%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Fallon
Get a more detailed risk assessment for a specific address.