Lead Paint Risk in Bunkerville, NV

16.2%Pre-1978 Housing
41Pre-1978 Units
253Total Housing Units
LowRisk Level

How Bunkerville Compares

Bunkerville
16.2%!<(MISSING)/span>
Nevada
22.5%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Bunkerville Residents

Most housing in Bunkerville was built after 1978 (83.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Bunkerville

Get a more detailed risk assessment for a specific address.