Lead Paint Risk in Gluckstadt, MS
10.7%Pre-1978 Housing
114Pre-1978 Units
1,069Total Housing Units
LowRisk Level
How Gluckstadt Compares
What This Means for Gluckstadt Residents
Most housing in Gluckstadt was built after 1978 (89.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Gluckstadt
Get a more detailed risk assessment for a specific address.