Lead Paint Risk in Duck Hill, MS

52.3%Pre-1978 Housing
170Pre-1978 Units
325Total Housing Units
ElevatedRisk Level

How Duck Hill Compares

Duck Hill
52.3%!<(MISSING)/span>
Mississippi
42.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Duck Hill Residents

Duck Hill has an elevated level of pre-1978 housing (52.3%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Duck Hill

Get a more detailed risk assessment for a specific address.