Lead Paint Risk in Zimmerman, MN
15.7%Pre-1978 Housing
358Pre-1978 Units
2,287Total Housing Units
LowRisk Level
How Zimmerman Compares
What This Means for Zimmerman Residents
Most housing in Zimmerman was built after 1978 (84.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Zimmerman
Get a more detailed risk assessment for a specific address.