Lead Paint Risk in Pine Springs, MN
53.3%Pre-1978 Housing
81Pre-1978 Units
152Total Housing Units
ElevatedRisk Level
How Pine Springs Compares
What This Means for Pine Springs Residents
Pine Springs has an elevated level of pre-1978 housing (53.3%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Pine Springs
Get a more detailed risk assessment for a specific address.