Lead Paint Risk in Hinckley, MN

58.9%Pre-1978 Housing
432Pre-1978 Units
734Total Housing Units
ElevatedRisk Level

How Hinckley Compares

Hinckley
58.9%!<(MISSING)/span>
Minnesota
52.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Hinckley Residents

Hinckley has an elevated level of pre-1978 housing (58.9%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.

Check a Specific Address in Hinckley

Get a more detailed risk assessment for a specific address.