Lead Paint Risk in The Pinehills, MA

1.5%Pre-1978 Housing
41Pre-1978 Units
2,817Total Housing Units
LowRisk Level

How The Pinehills Compares

The Pinehills
1.5%!<(MISSING)/span>
Massachusetts
68.2%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for The Pinehills Residents

Most housing in The Pinehills was built after 1978 (98.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in The Pinehills

Get a more detailed risk assessment for a specific address.