Lead Paint Risk in Woodworth, LA
17.2%Pre-1978 Housing
151Pre-1978 Units
879Total Housing Units
LowRisk Level
How Woodworth Compares
What This Means for Woodworth Residents
Most housing in Woodworth was built after 1978 (82.8% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Woodworth
Get a more detailed risk assessment for a specific address.