Lead Paint Risk in Supreme, LA
56.6%Pre-1978 Housing
220Pre-1978 Units
389Total Housing Units
ElevatedRisk Level
How Supreme Compares
What This Means for Supreme Residents
Supreme has an elevated level of pre-1978 housing (56.6%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Supreme
Get a more detailed risk assessment for a specific address.