Lead Paint Risk in Montpelier, LA
47.7%Pre-1978 Housing
61Pre-1978 Units
128Total Housing Units
ElevatedRisk Level
How Montpelier Compares
What This Means for Montpelier Residents
Montpelier has an elevated level of pre-1978 housing (47.7%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Montpelier
Get a more detailed risk assessment for a specific address.