Lead Paint Risk in Boothville, LA
2.1%Pre-1978 Housing
6Pre-1978 Units
284Total Housing Units
LowRisk Level
How Boothville Compares
What This Means for Boothville Residents
Most housing in Boothville was built after 1978 (97.9% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Boothville
Get a more detailed risk assessment for a specific address.