Lead Paint Risk in Kechi, KS

16.3%Pre-1978 Housing
169Pre-1978 Units
1,034Total Housing Units
LowRisk Level

How Kechi Compares

Kechi
16.3%!<(MISSING)/span>
Kansas
56.6%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Kechi Residents

Most housing in Kechi was built after 1978 (83.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Kechi

Get a more detailed risk assessment for a specific address.