Lead Paint Risk in Timberlane, IL
14.8%Pre-1978 Housing
61Pre-1978 Units
412Total Housing Units
LowRisk Level
How Timberlane Compares
What This Means for Timberlane Residents
Most housing in Timberlane was built after 1978 (85.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Timberlane
Get a more detailed risk assessment for a specific address.