Lead Paint Risk in Shiloh, IL

16.7%Pre-1978 Housing
950Pre-1978 Units
5,687Total Housing Units
LowRisk Level

How Shiloh Compares

Shiloh
16.7%!<(MISSING)/span>
Illinois
64.1%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Shiloh Residents

Most housing in Shiloh was built after 1978 (83.3% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Shiloh

Get a more detailed risk assessment for a specific address.