Lead Paint Risk in Belle Rive, IL
53.9%Pre-1978 Housing
103Pre-1978 Units
191Total Housing Units
ElevatedRisk Level
How Belle Rive Compares
What This Means for Belle Rive Residents
Belle Rive has an elevated level of pre-1978 housing (53.9%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Belle Rive
Get a more detailed risk assessment for a specific address.