Lead Paint Risk in Star, ID

6.4%Pre-1978 Housing
312Pre-1978 Units
4,884Total Housing Units
LowRisk Level

How Star Compares

Star
6.4%!<(MISSING)/span>
Idaho
39.9%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Star Residents

Most housing in Star was built after 1978 (93.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Star

Get a more detailed risk assessment for a specific address.