Lead Paint Risk in Suwanee, GA
2.8%Pre-1978 Housing
238Pre-1978 Units
8,356Total Housing Units
LowRisk Level
How Suwanee Compares
What This Means for Suwanee Residents
Most housing in Suwanee was built after 1978 (97.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Suwanee
Get a more detailed risk assessment for a specific address.