Lead Paint Risk in Powder Springs, GA
15.5%Pre-1978 Housing
1,002Pre-1978 Units
6,466Total Housing Units
LowRisk Level
How Powder Springs Compares
What This Means for Powder Springs Residents
Most housing in Powder Springs was built after 1978 (84.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Powder Springs
Get a more detailed risk assessment for a specific address.