Lead Paint Risk in Montrose, GA

15.5%Pre-1978 Housing
17Pre-1978 Units
110Total Housing Units
LowRisk Level

How Montrose Compares

Montrose
15.5%!<(MISSING)/span>
Georgia
32.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Montrose Residents

Most housing in Montrose was built after 1978 (84.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Montrose

Get a more detailed risk assessment for a specific address.