Lead Paint Risk in Lovejoy, GA

2.9%Pre-1978 Housing
100Pre-1978 Units
3,404Total Housing Units
LowRisk Level

How Lovejoy Compares

Lovejoy
2.9%!<(MISSING)/span>
Georgia
32.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Lovejoy Residents

Most housing in Lovejoy was built after 1978 (97.1% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Lovejoy

Get a more detailed risk assessment for a specific address.