Lead Paint Risk in Kingsland, GA
12.8%Pre-1978 Housing
931Pre-1978 Units
7,252Total Housing Units
LowRisk Level
How Kingsland Compares
What This Means for Kingsland Residents
Most housing in Kingsland was built after 1978 (87.2% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Kingsland
Get a more detailed risk assessment for a specific address.