Lead Paint Risk in Hogansville, GA
57.2%Pre-1978 Housing
810Pre-1978 Units
1,417Total Housing Units
ElevatedRisk Level
How Hogansville Compares
What This Means for Hogansville Residents
Hogansville has an elevated level of pre-1978 housing (57.2%). A significant portion of homes predate the lead paint ban. If your home was built before 1978, consider having it tested for lead paint.
Check a Specific Address in Hogansville
Get a more detailed risk assessment for a specific address.