Lead Paint Risk in Evans, GA
11.4%Pre-1978 Housing
1,530Pre-1978 Units
13,396Total Housing Units
LowRisk Level
How Evans Compares
What This Means for Evans Residents
Most housing in Evans was built after 1978 (88.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Evans
Get a more detailed risk assessment for a specific address.