Lead Paint Risk in Ellerslie, GA
14.5%Pre-1978 Housing
59Pre-1978 Units
407Total Housing Units
LowRisk Level
How Ellerslie Compares
What This Means for Ellerslie Residents
Most housing in Ellerslie was built after 1978 (85.5% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Ellerslie
Get a more detailed risk assessment for a specific address.