Lead Paint Risk in Duluth, GA

11.6%Pre-1978 Housing
1,509Pre-1978 Units
13,051Total Housing Units
LowRisk Level

How Duluth Compares

Duluth
11.6%!<(MISSING)/span>
Georgia
32.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Duluth Residents

Most housing in Duluth was built after 1978 (88.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Duluth

Get a more detailed risk assessment for a specific address.