Lead Paint Risk in Dawsonville, GA

9.3%Pre-1978 Housing
144Pre-1978 Units
1,553Total Housing Units
LowRisk Level

How Dawsonville Compares

Dawsonville
9.3%!<(MISSING)/span>
Georgia
32.3%!<(MISSING)/span>
National Average
50.5%!<(MISSING)/span>

What This Means for Dawsonville Residents

Most housing in Dawsonville was built after 1978 (90.7% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.

Check a Specific Address in Dawsonville

Get a more detailed risk assessment for a specific address.