Lead Paint Risk in Trinity, FL
2.4%Pre-1978 Housing
172Pre-1978 Units
7,169Total Housing Units
LowRisk Level
How Trinity Compares
What This Means for Trinity Residents
Most housing in Trinity was built after 1978 (97.6% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Trinity
Get a more detailed risk assessment for a specific address.