Lead Paint Risk in Sugarmill Woods, FL
10.6%Pre-1978 Housing
594Pre-1978 Units
5,624Total Housing Units
LowRisk Level
How Sugarmill Woods Compares
What This Means for Sugarmill Woods Residents
Most housing in Sugarmill Woods was built after 1978 (89.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Sugarmill Woods
Get a more detailed risk assessment for a specific address.