Lead Paint Risk in Ruskin, FL
18.6%Pre-1978 Housing
2,002Pre-1978 Units
10,778Total Housing Units
LowRisk Level
How Ruskin Compares
What This Means for Ruskin Residents
Most housing in Ruskin was built after 1978 (81.4% pre-ban). Area-wide lead paint risk is lower, but any home built before 1978 could still contain lead paint.
Check a Specific Address in Ruskin
Get a more detailed risk assessment for a specific address.